Parece que você não está na sua língua padrão. Ir para a versão em PortuguêsEn breve la version en EspañolDispensar

Lastest News

Surveying Modules Pancakes At Petrobras P-75

Febrary 11, 2015

The Company QGI Brasil S/A hired Survey Control for execution of Surveying services of modules pancakes Platform P-75 in the city of Rio Grande - Brazil.

Continue Lendo!

Survey Control Finish Work on Platform P-66

December 05, 2014

On 12/05/2014 Survey Control successfully ended...

Continue Lendo!

Start of Activities at Platform P-67

December 03, 2014

On this date was initiated activities involving all Surveying Structural Interface and pipes, including 3D laser scanning in the Platform P-67

Continue Lendo!

Survey Control Signs Contract with Petrobras/Ecovix For Surveying

October 16, 2014

On 15/10/2014 the Survey Control signs contract with Petrobras/Ecovix for execution of Surveying services...

Continue Lendo!

Completed Successfully Jumpers Manufacturing at UTC Engenharia

October 13, 2014

In October 2014, the Survey concludes successfully the package of a total of 13 jumpers in the UTC Engenharia construction site in the city of Niterói - Brazil

Continue Lendo!

Survey Control participates in Academic Week at FURG

October 07, 2014

On September 30, the Survey Control participated in the 4th Engineering School Academic Week of Federal University of Rio Grande (FURG) with the lecture "Scanning Technology 3D Laser and its applications.".

Continue Lendo!

Manufacture of DRS at UTC Niterói

April 17, 2014

Successfully UTC Engenharia along with surveying monitoring of Survey Control, set its first of a series of assembly of the DRS, which for us is very pleased to participate in a major project like this, which will be coupled to 1,800 feet...

Continue Lendo!

Survey Control in 3rd Rio Grande Naval Cluster Fair

January 05, 2014

From 11 to 14 March 2014, in CIDEC-SUL, at the Federal University of Rio Grande, happens the 3rd Rio Grande Naval Cluster Fair, where the Survey Control is pleased to participate for the 2nd time.

Continue Lendo!

Survey Control work is Featured in the Media

November 29, 2013

The 3D Laser Scanning of Casarão 6 (Big House 6) at Pelotas - Brazil conducted by Survey Control in partnership with the Department of Culture of Pelotas reflected in the local press.

Continue Lendo!

Finalization of P-55 Platform

October 06, 2013

It is with great honor and satisfaction that the Survey Control finish a big project reference to shipbuilding, Platform Petrobras P-55, where we operate from the preparation for the Deck Box projection in Hull from the bottom to its last operating days before his exit.

Continue Lendo!

Survey Control completes the registration at Petrobras

May 12, 2013

The Survey Control on April 1, 2013 successfully completed the providers registration with Petrobras...

Continue Lendo!

Survey Control participates in the 2nd Naval Cluster Fair

March 17, 2013

During the days March 12, 13, 14 and 15, happened in CIDEC-SUL, at the Federal University of Rio Grande, the 2nd Rio Grande Naval Cluster Fair. This year, the theme was about "Sea of Opportunities", now that the ‘gaucho’ naval clus er currently lives.

Continue Lendo!

Survey acquires the first Leica ScanStation P20

March 05, 2013

To offer our customers a unique experience in the provision of services, the Survey Control acquired the first Leica next-generation equipment of laser scanning in Latin America: the Leica ScanStation P20.

Continue Lendo!

P-55 Deck Mating Is Realized Successfully

July 07, 2012

On saturday (07/07), was completed Deck Mating of the semi-submersible platform P-55, the Naval Pole of Rio Grande (RS). The operation consists in the coupling between the platform deckbox, top, with the hull bottom, also called the lower hull.

Continue Lendo!

Survey Control launches new website

June 04, 2013

To update and always be at the forefront, the Survey Control launched Feb. 1 your new site. With a modern look and design designed for usability, the Survey Control reshapes your digital image.

Continue Lendo!

Survey conquer another partner

April 05, 2012

On the last day March 22, the Survey Control signed to Queiroz Galvão-for dimensional control of Petrobras P-58 platform (FPSO).

Continue Lendo!

Survey acquires new Leica Total Station TS11i

October 03, 2011

The Survey Control just purchased the newest line of Leica total stations, the TS11i model, which has innovative features such as built-in 5MP camera, integrated measurement programs and ease of exporting data in various ...

Continue Lendo!